The Missouri Department of Transportation plans to turn on the temporary stoplights at the intersection of Route 65 and Rebar near Nucor Steel the first week of April, weather permitting.

 

Work will continue over the next couple of weeks to install the temporary signals at US 65 and Rebar Road and US 65 and Routes H and HH. There will be temporary lane closures throughout the process. All work is weather dependent.

 

As part of the signal installation, MoDOT will reduce the speed limit to 55 miles per hour from Route HH south into Sedalia.

 

Motorists are reminded to slow down and pay attention while driving in work zones. Not all work zones look alike. Work zones can be moving operations, such as striping, patching or mowing. They can also be short term, temporary lane closures to make quick repairs or remove debris from the roadway.

 

For more information about MoDOT news, projects or events, please visit  www.modot.mo.gov/kansascity. For instant updates, follow MoDOT_KC on Twitter, or share posts and comments on Facebook at www.facebook.com/MoDOT.KansasCity.

MoDOT Kansas City maintains more than 7,000 miles of state roadway in nine counties. Sign up online for workzone updates or call 888-ASK-MODOT (275-6636).

More From Mix 92.3